Monday, August 01, 2005

Here are the parts to build the base of the mast
Here is the mast assembly glued and puttied - tomorrow I will sand and then add the 5 millimeter dowel
Here is the result - ready to be glued
next was to cut and glue the diagonal section - I first drew out the line, leaving a little extra material just in case, and then used a razor saw to cut.
now the real work on the main mast - I used some evergreen strip as I ran out of the 6x3 strip included with the kit (I don't know how that happened).
glued together the sections of the equipment locker