Thursday, April 14, 2005

After affixing the funnels to the superstructure, some additional bulkheads needed to be added. Here are two which have been puttied.
This is a shot of the superstructure and funnel from the bottom. Between this and the deck, there was a gap. As per suggestions, I used a strip of styrene all around the structure. Here is a section in progress.